PROJECTS

Staples Center Venue

Retrofit Construction Projects and ongoing system updates: Retrofitted Central Plant controls for (3) Trane Chillers, Ice Plant, (3) Cooling Towers and (2) Ajax Boilers. Performed integrations with new Grundfos Domestic Water Pumping Station. Ongoing migration from AX Jaces to LonIP Routers and direct control through Niagara N4 Supervisor Station. Also responsible for all user interfaces, graphics and controls. Protocols Used: BACnet MSTP, BACnet IP, Modbus RS485, Modbus TCP, Lonworks.

Cal Poly Pomona - Building 121 - Student Services

New Construction Project: (2) Buildings having (5) Air Handlers, 150+ VAVs, CHW and HHW Pump Station, domestic water heating via Cemline Heat Exchanger and Distech Lighting Controls throughout. Responsible for complete integration and programming of all HVAC and Interior Lighting Solutions. Protocols Used: Modbus TCP, Modbus RS485, BACnet MSTP

9465 Wilshire & 245 Beverly - Gersh Agency (MGM)

Retrofit Construction Projects and ongoing system updates: Central Plant Retrofit of 9465 Wilshire. Integrating with existing Carrier Chiller and new MultiPro MagLev Chiller with (2) new BAC Cooling Towers and existing boiler. Multiple Tenant Improvements including VAVs and Lighting Controls. Responsible for all HVAC Integrations and end user graphics pages into a N4 Niagara Supervisor. Protocols Used: BACnet MSTP, Lonworks, Modbus RS485, System600, Siemens Apogee

Farmers Insurance - IDS Real Estate - Woodland Hill

Retrofit Construction Projects and ongoing system updates: (2) 11 Story Buildings consisting of (2) Central Plants, (5) AHUs and 20+ floors of VAV and FPTU controls. Already retrofitted 10+ Floors of Siemens controls and replaced with new Distech VAV Controllers. Retrofitted the Central Plant of (1) with new controllers. Responsible for overall systems integration of HVAC Controls and an ongoing migration from Niagara AX to N4. Protocols Used: BACnet MSTP, Lonworks, Modbus RS485, Seimens Apogee

Glendale Community College - Sierra Vista Building

New Construction Project: (6) AHUs, CHW Pump Station, (2) Raypak Boilers, (4) Commercial Kitchen Hood Assemblies and General Exhaust, (9) VAVs and 100+ FDBUs. Project was converted from VVT to VAV logic midway through installation. The building is unique in that it employs AHU's serving Underfloor and Overhead Distribution systems utilizing a mixture of field modified VAV components and fan powered distribution units. Protocols Used: Lonworks

345 Brand - Bank of America

Retrofit Construction: (1) AHU and 40+ VAVs Responsible for Programming of all HVAC systems as well as Interior Lighting on 1st Floor and Exterior Site Lighting. Also created graphics pages for end user navigation and control. Standalone site with no Supervisor Workstation present. Protocols Used: BACnet MSTP

Panasonic Avionics

Retrofit Construction Project: 80+ Rooftop Package Units Responsible for programming and integration of all HVAC Controls. Created user navigations and graphics. Project utilized Johnson Controls Metasys running on a NAE45 Supervisory Device. Protocols Used: BACnet MSTP, JCI N2